Mitsubishi Corporation Urban Development, Inc. (Location: Chiyoda-ku, Tokyo; President & CEO: Kenji Morita; hereinafter the "company") and Kasumigaseki Capital Co., Ltd. (Location: Chiyoda-ku, Tokyo; President & CEO: Koshiro Komoto; hereinafter "Kasumigaseki Capital") announce the completion of construction of MCUD Logistics Higashi-Ogishima (LOGI FLAG TECH Higashi-Ogishima I; hereinafter the "facility"), jointly planned by the companies in the Higashi-ogishima, Kawasaki-ku area of Kawasaki, Kanagawa Prefecture.
While the company has developed logistics facilities under the MCUD LOGISTICS brand since 2013, the new facility marks its first automated cold storage development project.
Exterior View of MCUD Logistics Higashi-Ogishima (LOGI FLAG TECH Higashi-Ogishima Ⅰ)
The facility is an automated cold storage equipped with an automated rack system covering the entire frozen storage area on the third floor and offering storage capacity for 10,000 pallets.In recent years, the proliferation of online supermarkets, changes in consumer trends such as increasing numbers of dual-income and elderly households, demand for longer shelf life, and advances in freezing technology are increasing demand for frozen and refrigerated foods. However, the maintenance of cold chains is a significant societal issue, encompassing difficulties including restricted supply of new frozen and refrigerated warehouses, the aging of existing warehouses, and the securing of workforces under the harsh environment of sub-zero temperatures. Automated cold storage contributes to addressing these social challenges.
Located midway between central Tokyo and central Yokohama, the facility is well positioned to serve both major consumer markets and benefits from excellent transportation connectivity.
In addition to two major ports, it offers easy access to Haneda Airport, enabling the use of the Tokyo metropolitan region's primary logistics infrastructure.

1st floor berth

1st floor unloading/sorting area (1)

1st floor unloading/sorting area (2)

2nd floor office
The facility achieves energy conservation and environmental impact reduction in its equipment through the use of electrical power from a rooftop solar power generation system and through high-efficiency refrigeration equipment using natural refrigerants. The facility has also acquired A Rank certification under the Comprehensive Assessment System for Built Environment Efficiency (CASBEE) and highest-level 6-Star certification under the Building-Housing Energy-efficiency Labeling System (BELS).
| Certification program | Comprehensive Assessment System for Built Environment Efficiency |
| Evaluation tools | New Construction 2024 version |
| Month of certification | June 2026 |
| Evaluation rating | A Rank |
| Facility name | MCUD Logistics Higashi-Ogishima (LOGI FLAG TECH Higashi-Ogishima I) |
| Location | 29-4 Higashi-Ogishima, Kawasaki-ku, Kawasaki-shi, Kanagawa Prefecture |
| Access | Approx. 2.0 km from Ogishima Interchange on the Shuto Expressway Bayshore Route |
| Area of site | 5,000㎡ |
| Total floor area | Approx. 20,000㎡ |
| Number of pallets | 10,000 |
| Structure and scale | Steel structure, 3 floors |
| Design | Shiohama Industry Corporation, Tokyo Main Office, First-Class Architect Office |
| Construction | Shiohama Industry Corporation, Murata Machinery, Ltd. |
| Specifications | ・Automated cold storage rack system (-25°C) ・Refrigerated unloading/sorting space (+5°C) ・Adoption of non-fluorocarbon natural refrigerants |
* Due to the open internal structure of the automated cold storage, the stated total floor area includes deemed floor space used for floor-area-ratio calculations.

Surrounding area map

| Facility name | Location | Completion of construction |
| MCUD Logistics Chiba-kita | Aioi-cho, Wakaba-ku, Chiba-shi, Chiba Prefecture | December 2015 |
| MCUD Logistics Honmoku | Toyoura-cho, Naka-ku, Yokohama-shi, Kanagawa Prefecture | January 2016 |
| MCUD Logistics Kawasaki | Kitamigata, Takatsu-ku, Kawasaki-shi, Kanagawa Prefecture | May 2016 |
| MCUD Logistics Kawasaki II | Shiraishi-cho, Kawasaki-ku, Kawasaki-shi, Kanagawa Prefecture | January 2017 |
| MCUD Logistics Ichikawa II* | Shiohama, Ichikawa-shi, Chiba Prefecture | July 2017 |
| MCUD Logistics Zama | Hironodai, Zama-shi, Kanagawa Prefecture | January 2018 |
| MCUD Logistics Ichikawa*1 | Higashihama, Ichikawa-shi, Chiba Prefecture | January 2018 |
| MCUD Logistics Yachiyo | Midorigaoka-nishi, Yachiyo-shi, Chiba Prefecture | September 2019 |
| MCUD Logistics Ageo | Tsutsumizaki, Ageo-shi, Saitama Prefecture | June 2020 |
| MCUD Logistics Tsurugashima | Fujimi, Tsurugashima-shi, Saitama Prefecture | June 2020 |
| MCUD Logistics Kobe-nishi | Yasakadai, Suma-ku, Kobe-shi, Hyogo Prefecture | December 2021 |
| MCUD・SG Realty Kawasaki | Shimonoge, Takatsu-ku, Kawasaki-shi, Kanagawa Prefecture | May 2022 |
| MCUD Logistics Noda | Ozaki, Noda-shi, Chiba Prefecture | July 2022 |
| MCUD Logistics Kuki | Sakurada, Kuki-shi, Saitama Prefecture | November 2022 |
| MCUD Logistics Noda II | Nanakodai, Noda-shi, Chiba Prefecture | January 2023 |
| MCUD Logistics Kobe-nishi II | Mitsugaoka, Nishi-ku, Kobe-shi, Hyogo Prefecture | March 2023 |
| MCUD Logistics Sapporo | Yonesato, Shiroishi-ku, Sapporo-shi, Hokkaido | November 2023 |
| MCUD Logistics Minamisuita | Minamisuita, Suita-shi, Osaka Prefecture | November 2023 |
| MCUD Logistics Komaki-Kita | Fuso-cho, Niwa-gun, Aichi Prefecture | April 2024 |
| MCUD ZIP Hyogo-Tojo | Minamiyama, Kato-shi, Hyogo Prefecture | October 2024 |
| MCUD Logistics Komaki | Fumitsu, Komaki-shi, Aichi Prefecture | October 2024 |
| MCUD Logistics Kuki II | Ezura, Kuki-shi, Saitama Prefecture | December 2024 |
| MCUD・ZIP Osaka Hirano | Kamiminami, Hirano-ku, Osaka-shi, Osaka Prefecture | March 2025 |
| MCUD・ZIP Shizuoka Kakegawa | Hase, Kakegawa-shi, Shizuoka Prefecture | January 2026 |
| MCUD Logistics Higashi-Ogishima (LOGI FLAG TECH Higashi-Ogishima I)*2 | Higashi-Ogishima, Kawasaki-ku, Kawasaki-shi, Kanagawa Prefecture | June 2026 |
*1 Cold storage and processing center
*2 Automated cold storage
| Facility name | Location | Completion of construction |
| Kasukabe Shimoyanagi Logistics Development Project (tentative name)*3 | Shimoyanagi, Kasukabe-shi, Saitama Prefecture | Autumn 2027 |
| Osaka Hirano Station-front Mixed-Use Facility Project (tentative name) | Hirano-kita, Hirano-ku, Osaka-shi, Osaka Prefecture | Winter 2028 |
*3 Project management
Taking “To nurture the future of urban spaces through our power to imagine and realize change” as its stated Purpose, Mitsubishi Corporation Urban Development, Inc. engages in real estate and urban development unbound by convention, primarily in the industrial, retail, and entertainment domains. In the industrial domain, the company works in the area of dry logistics warehouses as well as the development of automated and other refrigerated and cold storage, multi-tenant life sciences R&D facilities (iPark Kobe), and multi-tenant manufacturing/R&D facilities under the innoba brand. In the retail and entertainment domains, the company engages in the development of urban retail facilities, Neighborhood Shopping Centers (NSCs), and hotels, as well as event projects at Yokohama Red Brick Warehouse and other sites. The company also undertakes large-scale urban development centered on arenas and other features.
Fully leveraging the comprehensive strengths of the Mitsubishi Corporation Group, which interfaces with a vast range of industries and customers in Japan and overseas, Mitsubishi Corporation Urban Development will continue to open up the potential of cities together with customers and partners.